Order Process Smart Meter | Ostrom Help Center
Order Process Smart Meter
Written by Philip Janz
May 5, 2026
π§ 1. What does the Smart Meter ordering process look like?
The path from ordering a Smart Meter to switching to the dynamic SimplyDynamic tariff works as follows:
- Check availability & cost (Website/App)
- Place your Smart Meter order
- Ostrom reviews your data & forwards your order to the grid operator
- Grid operator checks feasibility & schedules an installation appointment
- Smart Meter is installed at your home
- Meter data is transmitted via market communication
- Grid operator switches you to registrierende Lastgangmessung (RLM)
- Switch to the SimplyDynamic tariff once regular consumption data is received
π 2. How can I order a Smart Meter?
π You can request a Smart Meter in two ways:
- through our website, or
- directly in your Ostrom app
Prerequisite: You must be located in a cooperating grid area.
π 3. How do I know if a Smart Meter is possible at my locationβand what it costs?
On our website, simply enter:
- your postcode, and
- your annual electricity consumption
You will then see:
- whether we have a partnership with your grid operator, and
- how much the installation of the Smart Meter will cost.
π¬ If you want to know the exact cost for your specific Smart Meter, just ask us in the chat.
π€ 4. What happens after I place my order?
After you submit your order:
- we review your data, and
- we forward all Smart Meter orders to the grid operator at the beginning of each month.
You donβt need to take any further action β we handle everything.
π’ 5. What does the grid operator do after receiving the order?
After receiving your order, your grid operator checks:
- whether a Smart Meter can technically be installed at your location.
If the check is successful:
- the grid operator will contact you directly with an installation date proposal, or
- a service company commissioned by the grid operator (e.g., a metering technician) will contact you to schedule the installation.
π« 6. What happens if installation is not possible?
If your grid operator cannot perform the installation:
- we will contact you
- and inform you of the reason for the rejection.
Once the grid operator declines the installation, Ostrom can no longer mediate the meter change on your behalf.
π What can you do? You have two options to get your meter changed:
- Contact your grid operator (Netzbetreiber) directly to discuss alternatives or find out when installation may become possible.
- Reach out to a wettbewerbliche Messstellenbetreiber (wMSB) β a competitive metering point operator who can install the meter independently of the grid operator.
π 7. What are typical reasons for rejection?
Some common reasons why a Smart Meter cannot be installed are:
- π§ Metering concept (incompatible setup)
- βοΈ Controllable consumption devices
- π§© Competitive metering operator (wMSB) active at the supply point
- π‘ Insufficient signal at the meter location
- π Feed-in systems (e.g., PV systems requiring special metering concepts)
- π Meter cascades
Important notes:
- Not all reasons apply to all grid operators.
- Grid operators are at different stages of Smart Meter rollout.
- Many operators are working on adapting metering concepts or finding alternative solutions (e.g., when there is no signal at the meter location).
β±οΈ 8. How long does the grid operator have to carry out the installation?
Once the feasibility check is successful, the grid operator has:
- up to 4 months to install the Smart Meter in your home.
π§ 9. How long does the installation take?
The installation of your Smart Meter typically takes:
- about 30 minutes.
πΈ 10. What should I do after the installation?
After your Smart Meter is installed, you are welcome to:
- send us a photo of your new meter (e.g., in the chat).
Important:
- We cannot manually add your new meter to our system.
- All meter data must be transmitted to us via market communication from your metering point operator.
β³ 11. How long does data transmission takeβand what if nothing happens?
Data transmission times vary by metering operator, but:
- typically, all data should arrive within 12 weeks.
If your meter data has not arrived within 12 weeks:
β‘οΈ Please contact us so we can follow up with your metering operator.
π 12. Why is switching to RLM important for the dynamic tariff?
To use our SimplyDynamic tariff, we need:
- confirmation from your grid operator that your metering setup has been switched to registrierende Lastgangmessung (RLM).
Only then can we receive your interval consumption data (e.g., every 15 minutes).
π Since December 1st, 2024:
- the supplierβs right to choose the forecast basis has been removed.
- your grid operator is now responsible for performing the automatic rebalancing (Umbilanzierung).
Further details can be found in the:
β π "Application Guide β 24-Hour Supplier Change (Electricity)" (BDEW), see page 120.
π 13. When will I be switched to the SimplyDynamic tariff?
As soon as all requirements are met:
- We receive regular interval consumption data via market communication.
- We then switch you to SimplyDynamic at the next possible date.
- You will receive a tariff change confirmation by email with all important information.